Cloak for celebration


Cloak for celebration

Size: 36;
You will need:
100 g yarn Pluma Line Italy (93% acrylic, 7% polyamide, 100 g/169 m);
100 g yarn Iris Linea Italy (47% acrylic, 34% rayon, 13% nylon, 6% polyester, 100 g/256 m);
Knitting needles no. 6 and the knitting needles nr.8;
A bead pearly;
A sting.
Knitwear density: 6 stitches x 8 rows = 5 x 5 cm with knitting needles no.8.

Knitting explanation:
Attention! With knitting needles no. 8 it will knit with yarn in two (Pluma and Iris), with knitting needles no. 6 will be knit only with the yarn Pluma.
The central detail: On the knitting needles nr.8 is cast on 75 stitches and knit 5 cm with elastic 1 x 1 (1 knit stitch, 1 purl stitch).
Further it will knit as follows: * With knitting needles no. 6 is knitting 1 cm jersey point, with knitting needles no. 8 is knitting elastic 1 x 1 – 5 cm and in the last row will decrease evenly 8 stitches. Repeat from * another 2 times.

Then it will knit with knitting needles no. 6 - 1 cm jersey point , with knitting needles no. 8 – 3 cm elastic 1 x 1, with knitting needles no. 6 – 1 cm with all the stitches purl, both front rows and back rows, after that the stitches are closed.
Right side front: From the right side of the central detail, on the knitting needles no. 8 cast on 31 stitches and is knitting in the following way:cloak for celebration scheme
Row 1 (the front side of the work): 3 purl stitches, 10 knit stitches, 2 knit stitches together, 1 knit stitch, 2 front stitches together from behind the stitches, 10 knit stitches, 3 purl stitches;
Row 2 and all odd rows: All stitches purl;
Row 3: 3 purl stitches, 9 knit stitches, 2 knit stitches together, 1 knit stitch, 2 front stitches together from behind the stitches, 9 knit stitches, 3 purl stitches;
Row 5: 3 purl stitches, 8 stitches front, 2 knit stitches together, 1 knit stitch, 2 front stitches together from behind the stitches, 8 stitches front, 3 purl stitches;
Row 7:3 purl stitches, 7 knit stitches, 2 knit stitches together, 1 knit stitch, 2 front stitches together from behind the stitches, 7 knit stitches, 3 purl stitches;
Row 9: 3 purl stitches, 6 front stitches, 2 knit stitches together, 1 knit stitch, 2 front stitches together from behind the stitches, 6 front stitches, 3 purl stitches;
Row 11: 3 purl stitches, 5 knit stitches, 2 knit stitches together, 1 knit stitch, 2 front stitches together from behind the stitches, 5 knit stitches, 3 purl stitches;
Row 13: 3 purl stitches, 4 knit stitches, 2 knit stitches together, 1 knit stitch, 2 front stitches together from behind the stitches, 4 knit stitches, 3 purl stitches;
Row 15: 3 purl stitches, 3 knit stitches, 2 knit stitches together, 1 knit stitch, 2 front stitches together from behind the stitches, 3 knit stitches, 3 purl stitches;
Row 17: 3 purl stitches, 2 knit stitches, 2 knit stitches together, 1 knit stitch, 2 front stitches together from behind the stitches, 2 knit stitches, 3 purl stitches;
Row 19: 3 purl stitches, 1 knit stitch, 2 knit stitches together, 1 knit stitch, 2 front stitches together from behind the stitches, 1 knit stitch, 3 purl stitches;
Row 21: 3 purl stitches, 2 knit stitches together, 1 knit stitch, 2 front stitches together from behind the stitches, 3 purl stitches;print raincoat for Christmas party
Row 23: 3 purl stitches, from those 3 knit stitches, central stitch shall be taken on the working needle without knitting, stitch 1 and 3 are knitting together front and the resulting stitch shall be passes through that taken, 3 purl stitches = 7 stitches.

With those 7 remaining stitches is knitting 10-15 cm elastic 1 x 1, after that the stitches are closed.
The same will knit and the left front side.
Finishing: Will crochet a flower according to the scheme. The first flower will crochet with both yarns, the second flower only with Iris yarn. In the middle of the flower sew the bead pearly, and on the inside of the flower is fixed on the back side of the flower. The flower will be fixed on the front side of the cape according to the picture.


Leave a Comment

Your email address will not be published. Required fields are marked *