Your Highness Jacket


Your Highness Jacket

Your Highness JacketSize: 104-110;
You will need:
200 g fir Bravo Chant (52% lana merinos, 48% acril, 1400 m/100g);
Circular needles No.3;
knitting helpful;
4 buttons.

Work density: Ochiuri randuri = 27 x 36 10 x 10 cm;

Bobuletele: From eye girl face mesh knits 5. Paper returns, 5 purl stitches. Paper returns, 1 knit stitch, 3 stitches together front, 1 knit stitch. Paper returns, 3 mesh together dos. Paper returns, remaining eye goes right knitting needle.

Torsades de: Mounted on 25 stitches and knits andrea by Schedule A. Dupa 56 cm tricotati, stitches are closed.

Work description: Knitting jacket begins with torsades de.
Front and rear parts are knit as one detail to neckline sleeve , avoiding side seams.
The bottom of the jacket: From the edge of torsades de andrea 162 is mounted on mesh (in each 4-burners on the fringe will mount on andrea 3 eyelets). Point will be knit jersey. After 15 cm knitted, will close from both sides every 2nd row: 2 x1 ochi, 1x 2 ochiuri, 1x 3 sts, 1 x 4 stitches. Meshes remaining on a pass andrea helpful.Your Highness Jacket (back side)

Top of jacket: On the other end of torsades de andrea 155 is mounted on mesh. It will knit by Schedule B, starting from the 4th to the right eye. Dupa 2 cm tricotati, will knit 35 stitches under the scheme, 5 ochiuri se inchid, 75 mesh according to the scheme, 5 ochiuri se inchid, 35 mesh according to the scheme.
Further, each part shall knit separately.

Top back: It will continue knitting by Schedule B. Along the neckline sleeves will close from both sides of the row, every 2nd row 2 burners, 1 stitch.
Dupa 15 cm from the rascroiala manecii, will close 29 mesh in the middle and will knit each shoulder separately. From neckline will close every 2nd row 3 mesh, 1 stitch.
Dupa 18 cm from the rascroiala manecii, 16 stitches remaining close.

ParTea sus partilor the fata: It will continue knitting by Schedule B. Along the neckline sleeves will close every 2nd row 2 burners, 1 stitch.
Dupa 13 cm from the rascroiala manecii, disnpre neckline will close every 2nd row 8 mesh, 4 stitches, 2 stitches, 2×1 stitch.
Dupa 18 cm from the rascroiala manecii, 16 stitches remaining close.

Sleeve: Andrea 50 mesh-mounted. It will point jersey knit 5 rows, From among dos. It will knit 1 row mesh on the inside front, 2 rows point jersey.
Next row (front side) will knit as follows: * 9 mesh front, 1 bobulet* x 3, 10 knit stitches. They then knit 2 rows point jersey, in the next row all meshes dos (front side), point will then knit sweater.

After 18 cm knit 1 row will still knit mesh on the inside front. Then, on the inside, knitted be: 1 purl stitch, * 1 yarn over, 1 ochi dos* pana la sfarsitul randului. Among all meshes including jeteurile following will knit front = 99 mesh.
Dupa 14 cm of randul cu jeteuri, will close from both sides every 2nd row : 4 stitches, 2 x 3 stitches, 4 x 2 stitches, 4 stitches, 5 stitches, 6 stitches. Close remaining stitches.
Your Highness Jacket (scheme)
Finishing: It sews shoulders and side seams of the sleeves. The bottom of the sleeve to the inside bend to the first mesh inside and sew. It sew sleeves.

Neckline: On the inside of the neck is mounted on andrea rascroielii mesh. Knit 4 rows jersey point, a row on the front knitting stitches together inside each one bobulet after every 7 stitches. Knit 4 rows jersey point. Bend finish, bobuletele will be in the middle, and sew edge to the accuracy of rascroielii neck.

From the inner edges of the front of (back side) andrea mounts plates left on the knitting needle stitches helpful. The point jersey knits 7 series, From among dos. In the next row will be knit all stitches inside, although it is on the front row, then another 3 times point jersey. Follow meshed front row, and after every 14th one eye will be many bobulet.

Bobuletele will be distributed symmetrically. Knit 4 rows jersey point. Bend finish, bobuletele will be in the middle, and sew the front edge of jacket accuracy.
On the right side is done four lacing (is an arc of 4-5 mesh sweater chain). On the left side, the right buttons are sewn cheotoarelor.


Comments to Your Highness Jacket

  • Hello, Ms. Nina!

    Will follow the site much, e f. interesting.
    I have knitting after your explanations. some lucrusoare for nepotel. Now I want to do for a 2 year old niece, Your Height but jacket, I can not see the model scheme. Please help me.
    Thank you in advance!

    Diane Cain 14 February, 2016 3:46 pm
  • Nina 19 February, 2016 7:17 pm
  • Hello!
    Scheme e visible. If you have questions regarding the signs presented in scheme, help dearly.
    A good day!

    Nina 20 February, 2016 4:11 pm
  • Thank you! Best of luck in continuing!

    Diane Cain 25 February, 2016 9:45 pm

Leave a Comment

Your email address will not be published. Required fields are marked *